# 17LT completion

**URL:** <https://forum.clcboats.com/t/17lt-completion/36857>\
**Category:** Builder's Forum\
**Created:** [May 3, 2010, 2:21pm UTC](https://forum.clcboats.com/t/17lt-completion/36857 "2010-05-03T14:21:34Z")\
**Posts on this page:** 7\
**Page:** 1

<div class="post-metadata">

**Author:** ![George\_Jensen](https://avatars.discourse-cdn.com/v4/letter/g/9fc348/32.png) [@George\_Jensen](https://forum.clcboats.com/u/George_Jensen)\
**Post date:** [May 3, 2010, 2:21pm UTC](https://forum.clcboats.com/t/17lt-completion/36857/1 "2010-05-03T14:21:34Z")

</div>

I started on March 17th with plans and some 4x8 sheets of Okoume and on April 29th I went for a ride.&nbsp; Thanks to everyone who has posted information to this forum as it was a great help.

![All done.]()

&nbsp; ![On the water.]()

&nbsp;

---

<div class="post-metadata">

**Author:** ![George\_Jensen](https://avatars.discourse-cdn.com/v4/letter/g/9fc348/32.png) [@George\_Jensen](https://forum.clcboats.com/u/George_Jensen)\
**Post date:** [May 3, 2010, 2:35pm UTC](https://forum.clcboats.com/t/17lt-completion/36857/2 "2010-05-03T14:35:59Z")

</div>

Here's a couple of pictures.

![Finaished.](http://forum.ontarioconditions.com/ipb/uploads/1266977139/gallery_19740_10_31877.jpg)

&nbsp; ![On the water.](http://forum.ontarioconditions.com/ipb/uploads/1266977139/gallery_19740_10_27151.jpg)

---

<div class="post-metadata">

**Author:** ![Mark\_Schrimmer](https://avatars.discourse-cdn.com/v4/letter/m/d9b06d/32.png) [@Mark\_Schrimmer](https://forum.clcboats.com/u/Mark_Schrimmer)\
**Post date:** [May 3, 2010, 9:10pm UTC](https://forum.clcboats.com/t/17lt-completion/36857/3 "2010-05-03T21:10:32Z")

</div>

Looks good! I hope to finish mine soon, too.

Mark

---

<div class="post-metadata">

**Author:** ![Daniel\_Gralnick](https://avatars.discourse-cdn.com/v4/letter/d/c37758/32.png) [@Daniel\_Gralnick](https://forum.clcboats.com/u/Daniel_Gralnick)\
**Post date:** [May 3, 2010, 10:07pm UTC](https://forum.clcboats.com/t/17lt-completion/36857/4 "2010-05-03T22:07:18Z")

</div>

Hi,

Looks great.

Dan-Fl&nbsp;

---

<div class="post-metadata">

**Author:** ![Greg\_Fall](https://avatars.discourse-cdn.com/v4/letter/g/b38774/32.png) [@Greg\_Fall](https://forum.clcboats.com/u/Greg_Fall)\
**Post date:** [May 4, 2010, 6:31pm UTC](https://forum.clcboats.com/t/17lt-completion/36857/5 "2010-05-04T18:31:50Z")

</div>

The idea of finishing one of these in six weeks is unfathomable to me.&nbsp; I am impressed.&nbsp; Of course, it’s supposed to take three, right?&nbsp; Hm.&nbsp; Mine took four years.

---

<div class="post-metadata">

**Author:** ![Larry\_Mcinnis](https://avatars.discourse-cdn.com/v4/letter/l/f17d59/32.png) [@Larry\_Mcinnis](https://forum.clcboats.com/u/Larry_Mcinnis)\
**Post date:** [May 4, 2010, 8:29pm UTC](https://forum.clcboats.com/t/17lt-completion/36857/6 "2010-05-04T20:29:37Z")

</div>

I started mine last August..., yesterday I taped it up for painting.&nbsp; I figure I've got one month left to complete it;&nbsp;hope to have it on the water by June 1st at the latest.&nbsp; Can't wait!!!

Larry

---

<div class="post-metadata">

**Author:** ![George\_Jensen](https://avatars.discourse-cdn.com/v4/letter/g/9fc348/32.png) [@George\_Jensen](https://forum.clcboats.com/u/George_Jensen)\
**Post date:** [May 4, 2010, 10:29pm UTC](https://forum.clcboats.com/t/17lt-completion/36857/7 "2010-05-04T22:29:54Z")

</div>

In early March I was invited to go on a paddling trip the first week of May ( I leave&nbsp;in the morning!)&nbsp;and at that point I though it would be neat to go in a kayak.&nbsp; That gave me the motivation to take on the project and&nbsp;I figured I had enough spare hours each day to get it done.&nbsp;&nbsp;I will say though, that every step took longer than&nbsp;I&nbsp;thought it would.&nbsp;&nbsp; They key to getting it done was to prepare for the next step while the last step was curing/hardening/drying etc.&nbsp; I would say I put in 100 to 120 hours.

Here are a few of my trials and tribulations...most, if not all seemed to be common amongst the many builds I read about here.&nbsp; That's the beauty of this site.

-I tried a few scarfing jigs but wasn't satisfied with the outcome so I ended up doing them by hand with a plane.&nbsp; As is documented, it really isn't that difficult and really doesn't take that long.  
-I thought that the fillets would take 3 or 4 hours but they took 9.&nbsp;   
-I thought I could plane the sheer clamps in 3 or 4 hours but it took me 6.  
-I had to make a custom-sized aft bulkhead as the one in the plans was a little small.  
-I had a gap (like many others) between the forward bulkhead and the deck which I fixed with a thin slice of ply and a fillet.  
-My first deck beam sprung back too much so I had to change my jig&nbsp; radius and make another beam.&nbsp;  
-After installing the deck, the&nbsp;final radius of the foredeck was such that I had to make a second set of forward hatch frames that better matched the curvature of the deck.&nbsp;  
- I used Schooner Gold varnish and after 5 coats I think I was just starting to get the right mix of thinners, flow agents and techniques&nbsp;to get a good coat.&nbsp; (Thanks to Joey at CLC for some good tips)&nbsp; I think if I did 2 or 3 more coats&nbsp;that I might be close to nailing it but I'd had enough punishment after 5.&nbsp; (actually, 5 on the deck and bottom, 6 on&nbsp;one sheer and 7 on the other...but that's another story.)

Like the pirate code in the Pirates of the Carribean,&nbsp; the plans and instructions are more like guidelines rather than rules.&nbsp; I found that&nbsp;the key to moving steadily along with the build was to adapt things along the way and not worry about them too much.&nbsp; I kept telling myself that it would all work out in the end which it did.&nbsp; It's a beautiful craft and I'll probably build another for my wife; likely a CH16 from a kit.&nbsp;

Cheers.