Crunch Chester Yawl Build Log

I am sanding and filling in the hull the rest of today and going to try to lay fiberglass tonight or tomorrow. Plan to use thanksgiving time off to finish the inwales.

Not sure if I needed to blur out the HIN but wanted to show my solution. If anyone needs one message me. I can do them pretty quick for a few bucks for shipping.

I’m interested. When I get back home I’ll get my HIN and connect.

1 Like

Working out the next steps. Do we think it is wise to mostly finish the inside before doing the inwales? Since I will paint most of it, only leaving seats, decks, and the in/outwales bright, I was thinking I should do all the sanding and epoxy work on the inside, then do inwales, then final coats of paint.

Or…. should I pause now and flip and completely finish the outer haul first? Right now outer haul has 2 ish coats of epoxy and no skeg yet.

Other question anyone do a bigger hatch up front? Ideas I saw this one

Also thought about putting a big hatch lid on the deck because I do plan to put a cushion up there as it will probably be my pups lookout point anyways. Thoughts?

No wrong answers really, you are working indoors so you have some flexibility. I built largely outside so getting encapsulated and painted was a very high priority for me. I think final finish is determined largely by how long you want to sand. I thought I sanded quite a bit but still have a spot or two that should have been sanded more.

1 Like

I think painting interior before installing the inwales is a great idea.

Mask a clean line and keep the upper edge of the plank bright between the spacers would be pretty easy to pull off a clean job.

1 Like