While epoxing the bulkheads, a few epoxy runs/drips accumulated, despite my best efforts. I've started to sand off the drips and clean up the wood, but I'm wondering how deep I should sand to make sure that when I put finish coats on, the drips won't be visible. Anyone want to weigh in?
Thanks in advance.