For some reason - possibly because I watched videos showing it - I thought we cut and fitted the hatches aftter finishing (Paint/varnish etc.)
I am at the varnish stage myself - but I am starting to thing I should have cut the hatches sooner.
What are the thoughts about when to cut the hatches - should I go ahead and get them installed now or wait until after varnishing?
It seems I spent a lot of time getting a loverly defect free smooth curved deck - only to now go and cut a hole in it - I may have been able to save time, resin and a lot of sanding earlier in the process.