Rhode runner typos/omissions in instructions

I’m getting started on my journey with the Rhode Runner. I believe there are a few errors in the documentation, but want to check to make sure it isn’t that I don’t understand the instructions. The four typos I’ve noticed (I think). Can someone who has already done the build share their thoughts?

Notes Pages
port longitudinal stringer, fwd and aft is mssing from the component checklist 4,5
doubler 2a marked as doubler 2 7
4th operation should read: bond floorboard cleats to doubler 2a and doublers 3a and 3b with thickened epoxy 7
last operation should be forward of frame 6 16
no operations for footbrace 30