I’m getting started on my journey with the Rhode Runner. I believe there are a few errors in the documentation, but want to check to make sure it isn’t that I don’t understand the instructions. The four typos I’ve noticed (I think). Can someone who has already done the build share their thoughts?
Notes | Pages |
---|---|
port longitudinal stringer, fwd and aft is mssing from the component checklist | 4,5 |
doubler 2a marked as doubler 2 | 7 |
4th operation should read: bond floorboard cleats to doubler 2a and doublers 3a and 3b with thickened epoxy | 7 |
last operation should be forward of frame 6 | 16 |
no operations for footbrace | 30 |